City of Keller, TX
Home MenuMt. Gilead Road Improvements Project
Engineering activities are underway for improvements along Mt. Gilead Road from Main Street (Hwy. 377) to Bourland Road/Marshall Ridge Parkway.
The project will encompass the entire above-referenced section, including the intersection at Bourland. It will involve a 3-lane adjustment to the roadway between Main Street and Oak Drive, transitioning to the existing 2-lane width through to the intersection at Bourland/Mt. Gilead Road, concluding with a roundabout. Additional activities will include the installation of a sidewalk, drainage and water system improvements.
Several communications have gone out to this point, including letters, signs, and public meetings with residents and the City Council.
| Project Goals | Project Considerations |
|
|
Current Status
Join us at 6 p.m. Monday, Dec. 9 at Keller Town Hall, 1100 Bear Creek Pkwy., to learn about the latest plans for road adjustments, pedestrian amenities and upgrades to the Mt. Gilead/Bourland intersection.
- Download the Resident Notification Letter mailed Nov. 14
- Download the HOA Notification Letter mailed Nov. 14
Can’t make it in person? The presentation will be broadcast live, recorded and archived on the city website and YouTube channel.
Background
Dec. 3, 2024
The City Council received a project update and provided direction to staff regarding the public information meeting.
- Watch the Work Session Presentation (Item D-3; Discussion at 06:35:55)
- Download 60% Roadway Design Plan Roll Plots
Feb. 21, 2024
Public Works hosted a public information meeting on to discuss project updates for the Mt. Gilead Road project.
Jan. 16, 2024
The City Council received a project update and provided direction to staff regarding a change in scope.
- Watch the Work Session Presentation (Item D-2; Discussion at 48:00)
- Download Original 30% Roadway Design Plan
- Download Rescoped 30% Roadway Design Plan
Nov. 20, 2023
The City Council received an update on the status of the Mt. Gilead Road Reconstruction project.
- Watch the Work Session Presentation (Item D-1; Discussion at 10:25)
Oct. 25, 2023
Public Works hosted a public input meeting on possibilities for the Mt. Gilead Road project.
- Watch the Presentation
- Download Presentation PDF
- Download 30% Roadway Design Plan
- Download Drainage Exhibits
- Download Intersection Concepts
- Download Traffic Analysis - Mt. Gilead Road
- Download Meeting Sign-In Sheets, Submitted Comment Cards
- Download Resident Notification Letters
Oct. 17, 2023
The City Council received an update on the status of the Mt. Gilead Road Reconstruction project.
- Watch the Presentation & Discussion (Item D-2; Discussion at 46:30)
Dec. 6, 2022
The City Council awarded a contract to Kimley Horn for design engineering of the Mt. Gilead Road Reconstruction project.
- Watch the Presentation & Discussion (Item F-10; Discussion at 28:08)
- Download Resident Notification Letters